OSRS Construction 70 to 99 Calculator

12,296,804 XP separates level 70 from level 99 in Construction. Check the fastest, cheapest and balanced routes below, then enter your own stats to see your own numbers.

Quick answer

Construction 70 to 99 takes 12,296,804 XP. The fastest route needs about 11.5 h and the cheapest about 69.5 h.

RouteTimeNet GP
Fastest11.5 h-163.3M gp
Cheapest69.5 h-60.6M gp
Balanced34.2 h-75.1M gp

Fastest route, level by level

LevelsMethodXPXP per hourTime
70 to 77Mahogany tables737,954750,00059 min
77 to 99Gnome benches (superior garden)11,558,8501,100,00010.5 h

Construction methods

MethodLevelsXP per hourGP per hour
Gnome benches (superior garden)77+1,100,000-14.6M gp/h
Mahogany tables52 to 76750,000-10.0M gp/h
Teak garden benches66 to 73550,000-4.6M gp/h
Oak dungeon doors74 to 76520,000-4.4M gp/h
Mounted mythical capes50+360,000-2.2M gp/h
Mahogany Homes (Expert contracts)70+177,000-872K gp/h

XP milestones

LevelTotal XPXP from level 70
801,986,0681,248,441
905,346,3324,608,705
9913,034,43112,296,804

Common questions

How much XP do you need to train Construction from 70 to 99 in OSRS?

Level 99 Construction needs 13,034,431 XP in total. Starting at level 70 (737,627 XP), you need to gain 12,296,804 XP. Level 92 is only the halfway point in XP terms, at 6,517,253 XP, so the last seven levels take as much XP as the first ninety-one.

How long does it take to train Construction from 70 to 99?

With the fastest route it takes about 11.5 h of play, roughly 6 days at 2 hours a day. The cheapest route takes about 69.5 h. Your own time depends on your gear, stats and how closely you follow each method.

What is the fastest way to train Construction from 70 to 99?

The fastest route is Mahogany tables from level 70 to 77, then Gnome benches (superior garden) from level 77 to 99. It averages about 1,070,033 XP per hour over the whole goal.

How much does it cost to train Construction from 70 to 99?

The cheapest route costs about 60.6M gp, while the fastest route costs about 163.3M gp. These are estimates from typical prices and rates, net of supplies and loot.

Construction calculator · All calculators · Account Planner